Simulation control tower airport
Simulation control tower airport
Assignment name: Next Tower | Name of client: Compagnia del Progetto |
Country: Italia, Palermo | Duration: 3 months |
Start date (month/year): 2013 | Completion date (month/year): 2013 |
Narrative description of Project: In the design of the new control tower of the airport of Palermo was built a simulation model in 3d. The system allows you to check the spaces and workplaces inside the tower to check in real-time the visibility of the runway from various locations within this and with different visibility conditions, giving way to verify that the design solutions correspond to the requirements for this environment. |
|
Description of actual services provided by your staff within the assignment:
|
|